Ballade Sports | Daily Shop Grind
#51
Former Sponsor
Thread Starter
Finished up a K24 i-Vtec swap for this GPW ap1. The torque feel of this car is so enjoyable for daily driving!
Last edited by BalladeSports; 12-09-2016 at 09:12 AM.
#53
Former Sponsor
Thread Starter
Today we're working on two projects:
About 70% finished with this turbo build
and then working on a valve job for this S2k.
Here is a shot of the Cylinder head with burnt valves on all the exhaust side.
Over the years we have seen this time and time again. Compression loss due to burnt valves, bad valve seats, bent valves. Be sure to keep up with your valve adjustments and timing chain replacements.
About 70% finished with this turbo build
and then working on a valve job for this S2k.
Here is a shot of the Cylinder head with burnt valves on all the exhaust side.
Over the years we have seen this time and time again. Compression loss due to burnt valves, bad valve seats, bent valves. Be sure to keep up with your valve adjustments and timing chain replacements.
#55
Former Sponsor
Thread Starter
Changing the timing chain is when needed based on mechanics inspection of the timing chain stretch. Alternatively we created an off set timing gear which replaces your stock gear to compensate for the timing chain stretch.
This short cuts the necessity to have to change the timing chain. 1 hour installation versus 9 hour installation for the whole chain.
This short cuts the necessity to have to change the timing chain. 1 hour installation versus 9 hour installation for the whole chain.
#56
Originally Posted by BalladeSports
Changing the timing chain is when needed based on mechanics inspection of the timing chain stretch. Alternatively we created an off set timing gear which replaces your stock gear to compensate for the timing chain stretch.
This short cuts the necessity to have to change the timing chain. 1 hour installation versus 9 hour installation for the whole chain.
This short cuts the necessity to have to change the timing chain. 1 hour installation versus 9 hour installation for the whole chain.