Dragon resurfacing
BULLETIN FEB 26: TN DOT ADVISES THE
REPAVING OF THE DRAGON FROM TABCAT
BRIDGE TO THE NC STATE LINE WILL BEGIN
SOMETIME AFTER APRIL 15. THE PROJECT
SHOULD TAKE 2 OR 3 WEEKS. A GRANITE
OR NATURAL SAND TOPPING (A "NON-SKID"
SURFACE) WILL BE APPLIED. THIS IS THE
SAME AS THE EXISTING SURFACE. WE WILL
HAVE MORE SPECIFIC INFO BY APRIL 1.
I hope sometime after "April 15" is at least after April 21!
REPAVING OF THE DRAGON FROM TABCAT
BRIDGE TO THE NC STATE LINE WILL BEGIN
SOMETIME AFTER APRIL 15. THE PROJECT
SHOULD TAKE 2 OR 3 WEEKS. A GRANITE
OR NATURAL SAND TOPPING (A "NON-SKID"
SURFACE) WILL BE APPLIED. THIS IS THE
SAME AS THE EXISTING SURFACE. WE WILL
HAVE MORE SPECIFIC INFO BY APRIL 1.
I hope sometime after "April 15" is at least after April 21!
I got the info from a friend who lives in Knoxville, sent it to me. I have replyed to him asking for the source.
The good news, when have you ever known a goverment project to start on time?
The good news, when have you ever known a goverment project to start on time?
I'll speak with Airgate, we may have to change the event date. Not much solid info on the bulletin, saying that the DOT is going to start repaving sometime after April 15th doesn't tell us much. We could postpone until June 15th and still be dodging paving equipment
.
.
Originally posted by S2k Dude
.... We could postpone until June 15th and still be dodging paving equipment
.
.... We could postpone until June 15th and still be dodging paving equipment
.
Trending Topics
Thread
Thread Starter
Forum
Replies
Last Post






Or short cuts.
