The Leg Installation Scheduling Thread
Originally Posted by animeS2K,Jun 5 2007, 01:08 PM
Here we will attempt to actually schedule the installation of the :leg:
Edit September 20, 2007:
The "Leg" was originally supposed to be fabricated by Dom@ISP. We started planning and met first in January, 2007, at which point I paid him approximately 50% as a deposit towards the cost of $305, to include materials and labor.
At one point, I was told that since it was taking so long to complete, he'd cover the other 50% of the cost. I've seen the wooden portion of the leg in person, as Dom came by to measure for the aluminum pieces that were to go on the sides and top and bottom of the leg. That was in February.
Here it's September, creeping into October and this one last remaining piece of our kitchen remodel is nowhere to be found... Even though I paid a deposit and was told the rest wasn't required. At this point, I don't know what to do but call Dom out as a scammer, after months and months of being led on and never getting either a straight answer or a call back and him completely skipping out on promised times that we'd meet up.
It was funny at first. Then it was a joke. Now I'm pissed. All I want it my god damned leg that I paid for and have waited patiently for over six months to be delivered. I've offered to meet him somewhere, to pick it up at the shop, everything. But there's always some reason it's not done or I can't pick it up or he can't deliver it.
27 Feb 2007:

27 Aug 2007:

25 Jan 2007:
21 Mar 2007:
23 Mar 2007:
17 Apr 2007:
26 Apr 2007:
15 May 2007:
30 Aug 2007:

Edit September 20, 2007:
The "Leg" was originally supposed to be fabricated by Dom@ISP. We started planning and met first in January, 2007, at which point I paid him approximately 50% as a deposit towards the cost of $305, to include materials and labor.
At one point, I was told that since it was taking so long to complete, he'd cover the other 50% of the cost. I've seen the wooden portion of the leg in person, as Dom came by to measure for the aluminum pieces that were to go on the sides and top and bottom of the leg. That was in February.
Here it's September, creeping into October and this one last remaining piece of our kitchen remodel is nowhere to be found... Even though I paid a deposit and was told the rest wasn't required. At this point, I don't know what to do but call Dom out as a scammer, after months and months of being led on and never getting either a straight answer or a call back and him completely skipping out on promised times that we'd meet up.
It was funny at first. Then it was a joke. Now I'm pissed. All I want it my god damned leg that I paid for and have waited patiently for over six months to be delivered. I've offered to meet him somewhere, to pick it up at the shop, everything. But there's always some reason it's not done or I can't pick it up or he can't deliver it.
27 Feb 2007:

27 Aug 2007:

25 Jan 2007:
21 Mar 2007:
23 Mar 2007:
17 Apr 2007:
26 Apr 2007:
15 May 2007:
30 Aug 2007:

Sorry to hear that this is still dragging out. What a pain. If you tell someone you are going to do something, be like Skip and DO IT.
Did you take his ****ing seats as revenge?????
Sorry, had to go there.
looks like he's using the money you gave him for the leg to go to aspen
https://www.s2ki.com/forums/index.ph...=531545&st=900
2/3's of the way down the page
https://www.s2ki.com/forums/index.ph...=531545&st=900
2/3's of the way down the page