1. TRAFFIC CONTRACTOR SHALL UTILIZE THE FDOT STANDARD INDICES 600, 613, & 615 TO CONSTRUCT WIDENING AND
MILL AND RESURFACE EXISTING PAVEMENT.
2. THE POSTED SPEED LIMIT SHALL REMAIN THROUGHOUT THE WORK ZONES.
3. THE CONTRACTOR IS TO MAINTAIN SIDE STREET NAME IDENTIFICATION DURING CONSTRUCTION OPERATIONS IN ORDER TO
FACILITATE EMERGENCY VEHICLE TRAFFIC.
4. ALL PEDESTRIAN TRAFFIC IS TO BE MAINTAINED AT ALL TIMES DURING THE CONSTRUCTION PROCESS PER STANDARD INDEX
660.
5. LANE CLOSURES SHALL BE RESTRICTED DURING PEAK HOURS: 7:00 - 8:00 AM AND 4:00 - 6:00 PM.
6. ALL LANE CLOSURES MUST BE REOPENED WITHIN 12 HOURS OF A HURRICANE EVACUATION OR OTHER OTHE CATASTROPHIC
EVENT, AND SHALL REMAIN OPEN FOR THE DURATION OF THE EVACUATION OR EVENT AS DIRECTED BY THE ENGINEER.
That was way less interesting than I thought. Leftovers from yesterday!
MILL AND RESURFACE EXISTING PAVEMENT.
2. THE POSTED SPEED LIMIT SHALL REMAIN THROUGHOUT THE WORK ZONES.
3. THE CONTRACTOR IS TO MAINTAIN SIDE STREET NAME IDENTIFICATION DURING CONSTRUCTION OPERATIONS IN ORDER TO
FACILITATE EMERGENCY VEHICLE TRAFFIC.
4. ALL PEDESTRIAN TRAFFIC IS TO BE MAINTAINED AT ALL TIMES DURING THE CONSTRUCTION PROCESS PER STANDARD INDEX
660.
5. LANE CLOSURES SHALL BE RESTRICTED DURING PEAK HOURS: 7:00 - 8:00 AM AND 4:00 - 6:00 PM.
6. ALL LANE CLOSURES MUST BE REOPENED WITHIN 12 HOURS OF A HURRICANE EVACUATION OR OTHER OTHE CATASTROPHIC
EVENT, AND SHALL REMAIN OPEN FOR THE DURATION OF THE EVACUATION OR EVENT AS DIRECTED BY THE ENGINEER.