O-turn's Build Thread, son.
Originally Posted by Vadster,Jul 30 2008, 08:52 AM
what do yous guys call it? 

None of it will go in until almost the end, though. Usually installed by the trim guys or the stair company will come back.
A ton of materials are probably still being carried up and down those stairs. Each trip could damage the rail so it is usually left off until the big work is done.
HOWEVER... Per our friends at OSHA, there should be a temp rail on those stairs.









