Well its been a few days (A few grueling busy, dirty, crazy, sweaty, hate myself days) since my last update, and I wanted to post some of the latest pics since I am to sore to stand up and go act like I'm working while walking around the office....
We have the hearth Tiled (Thanks Zeke & Liz bigtime) and the drywall is sanded and the attic is insulated. Now is crunch time for us, priming, floor molding, Bathroom Tile, Kitchen Cabinets, Railings, are all on the agenda for the next week and a half and have to be done to get our subs back in to get their finals done...
Last night Jason, Bree, Kari, Myself, Kari's Father & stepmother, & Kari's & I's high school friend came up to put some priming on the walls, with the main goal being the kitchen and bathrooms, we ended up getting 2 coats finished in all of those rooms and started on the great room (Which I have to paint myself now as opposed to hiring someone, 1200 dollars for that room is not even realistic!) and got 1 coat in each of the guest bedrooms as well, so it was a productive night to say the least!
I think with one more epic paint party we should be finished with prime and Im only gonna get color in the rooms that are neccessary at this point after that. Ditto that for molding, I plan to get the baseboard moldings down in the rooms to be carpeted and the rest will go down over the winter when Im bored on the weekends (Right now Im working 7 days a week at 2 jobs :fail: )
Pics:
Kitchen ready for color
The railing ready to be installed saturday
The steps with urethane
Dining room also ready for color
Garage landing I have since abandoned until later date, I know it needs to move