Well another week, more stuff going on around the house. This weeks goals are to begin bathroom tile, and get more prime work done, kitchen tile and railings were installed over the weekend.
Color was put up in the kitchen and I hope to have the color done in the bathrooms and laundry room by sunday. All of our bathroom fixtures are in and sitting in the garage waiting to go in (hopefully late next week!)
Here are a few pics I snapped this morning....
The finished front shot (Garage Door down & locked)
With another week past, paint is covering all of the walls and all of the ceiling paint has been applied, and laminate has been laid in the laundry room....
Jason (Magikcow) and his +1 as well as Chip (Gigdy) helped out immensley yesterday and finished way more than we had planned to. Thanks guys & Gal
Zeke and I tackled durrock in the 2 bathrooms and a wonderful storm that slowed things down and took our light. (DEY TUK AWR LIGHT!)
This week the tile should be finished in all bathrooms & shower, the laminate will be laid (except where I have to do it ) and the steps will be done in the garage so we dont have to jump in the house anymore, and ALL light fixtures, ceiling fans and such are going in tommorrow!
Countertops were ordered this weekend and should be here in about 2 weeks. So as of right now it looks as though we will be able to move in on or about september 6th....
Well as most of you know, I've gone into hiding The only way one can see me is inside this house We are working frantically to get this to move in status and we are moving at a RAPID pace. The last pics I posted seem like ages ago with the progress we have now...
Last monday we had no flooring except in the kitchen, now all 3 bathrooms are tiled and have vanities installed, and the upstairs hallway has pergo flooring installed. We had openings where lights would go, now we have light fixtures through 75% of the house and all of the outlets installed. No doors were purchased yet, now they are purchased and hung except 2, and 2 bedrooms have base molding and are ready for carpet. Things are moving