Random Talk 2014
Originally Posted by #172CR
lol what is that?
It's mainly designed to fill in the gaps when wind generated power slows down but the load requirement is still present. May become more common as Boardman, our base load coal plant, is to be decommissioned in 2020.
Unfortunately it doesn't have VTEC, kind of cool though!
Originally Posted by #172CR
lol what is that?
It's mainly designed to fill in the gaps when wind generated power slows down but the load requirement is still present. May become more common as Boardman, our base load coal plant, is to be decommissioned in 2020.
Unfortunately it doesn't have VTEC, kind of cool though!







