Under construction finally
We sold our house in 6 weeks and settled in June 14. The GT was sold back in Sept 13 and tried to buy a water front lot. That took a lot longer
than anticipated but during the time we found a design on line and got an architect to modify to our requirement. We got a great builder and a guy to build the pier with RipRap. So her we are living in Baltimore with our daughter in a 100 year old house in Canton. So I thought it would be good to share some photos.
than anticipated but during the time we found a design on line and got an architect to modify to our requirement. We got a great builder and a guy to build the pier with RipRap. So her we are living in Baltimore with our daughter in a 100 year old house in Canton. So I thought it would be good to share some photos.
Maybe another two car under the adjacent Guest House 
When will the first S2000 gathering take place, and is there a good seafood place nearby?
The standalone two car gararge is 28'x26' with 10' ceiling and a upstairs for man cave. The house has a two car garage with 10' ceiling as well. So the space is a lot more than I had at our previous house
You can see openings in this pic
You can see openings in this pic











Pier done for now. When house gets finished will add boat lift, water, lighting and electricity