how long (and $) to install F20C engine/tranny?
I have an S2000 that has no engine or tranny in it. It did about 1 month ago, so the hoses / radiator, etc... are there.
If I buy a engine/tranny combo swap. How long would you expect it to take to drop it in and get everything hooked up?
i think there are just two motor mounts. can the swap come in from the top or do you have to undo the subframe and bring it from the bottom?
I was quoted $1k from one place. A more local place says $62.00 an hour and they won't commit to how many hours, but usually they are pretty good guys.
thank you.
If I buy a engine/tranny combo swap. How long would you expect it to take to drop it in and get everything hooked up?
i think there are just two motor mounts. can the swap come in from the top or do you have to undo the subframe and bring it from the bottom?
I was quoted $1k from one place. A more local place says $62.00 an hour and they won't commit to how many hours, but usually they are pretty good guys.
thank you.
I can do a full swap (given that all parts are on hand) in less than 8 hours. The best way to do it is to drop the front subframe and drop the whole engine/trans out of the bottom. I've seen it get pulled from the top but it's ugly. $1000 bucks to swap the motor seems like a good deal to me. Dealers will charge way more than that.
Complete Assembly Without Transfer of Parts B 8.8 Notes
Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
Complete Assembly With Transfer of Parts B 11.8 Notes
Includes: Transfer All Fuel & Electrical Units. Does Not Include Replacement Of Optional Equipment.
Short Block B 17.3 Notes
Includes: R&I Engine And Replacement Of All Necessary Components.
Long Block B 15.3 Notes
Includes: R&I Engine And Transfer All Necessary Components Not Supplied With Long Block.
Note
To R&R Cylinder Head, Add
Bare Assembly B 1.9 Notes
Complete Assembly B 0.6 Notes
To Grind Valves, Add
All Cyls B 3.8 Notes
Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
Complete Assembly With Transfer of Parts B 11.8 Notes
Includes: Transfer All Fuel & Electrical Units. Does Not Include Replacement Of Optional Equipment.
Short Block B 17.3 Notes
Includes: R&I Engine And Replacement Of All Necessary Components.
Long Block B 15.3 Notes
Includes: R&I Engine And Transfer All Necessary Components Not Supplied With Long Block.
Note
To R&R Cylinder Head, Add
Bare Assembly B 1.9 Notes
Complete Assembly B 0.6 Notes
To Grind Valves, Add
All Cyls B 3.8 Notes
Originally Posted by Scot,Nov 2 2005, 09:08 AM
especially since my old engine and tranny is already out.
Thread
Thread Starter
Forum
Replies
Last Post








